Demonstration Cases
Typology baseline representative for deep renovation in the EU
Half
of the residential stock in the EU was built between 1945 and 1970,
before the first thermal regulations came into force. This is the main
target for deep renovation to yield the highest EEB impact considering
the type of dwellings, multi-family dwellings are 49%-70% in this
category. This becomes the typology for the baseline for impact
calculation in BIM-SPEED, i.e. medium-rise, multi-family dwellings built
between 1945 and 1970 (5-6 floors; average façade area excluding
windows app. 1100 m2, mainly made of prefab concrete construction
techniques).
The planned real demonstration activities based on BIM
The following activities are planned to be performed on demonstration cases during the course of the project:
1. As-Built data acquisition and BIM modelling
2. Renovation design
3. BEM and performance simulations
4. Renovation execution (off-site and on-site construction)
5. Post-renovation evaluation and long-term maintenance planning